Army taps BAE Systems to build AMPV armored personnel carrier combat vehicles using open-systems standards

Aug. 7, 2023
The AMPV consists of five vehicle variants: general purpose, mission command, mortar carrier, medical evaluation, and medical treatment vehicles.

WARREN, Mich. – Armored combat vehicles experts at BAE Systems will build additional Army's Armored Multi-Purpose Vehicles (AMPV) under terms of a $119.7 million order announced Thursday. The AMPV is a new networked armored vehicle set to take-on battlefield duties as an armored ambulance, mortar carrier, engineer vehicle, and command vehicle.

Officials of the U.S. Army Contracting Command-Detroit Arsenal in Warren, Mich., are asking the BAE Systems Platforms & Services segment in York, Pa., for AMPV production. The number of vehicles involved in the order was not specified.

The Army's AMPV armored combat vehicle program consists of five vehicle variants: general purpose, mission command, mortar carrier, medical evaluation, and medical treatment vehicles. The contract is for early-order material in support of future AMPV purchase, and facility-capacity-expansion efforts to increase AMPV production.

The AMPV, which is to replace the Army’s Vietnam-era M113 armored personnel carriers, and also will back-up the BAE Systems M2A3 Bradley Fighting Vehicle on the battlefield.

Related: Oshkosh fielding JLTV combat vehicles with VICTORY-based vetronics and open-systems standard electronics

The AMPV program calls for vetronics and software that adhere to the U.S. military's Vehicle Integration for C4ISR/EW Interoperability (VICTORY) open-systems standards, which use an adopt-adapt-author approach independent of specific hardware or software.

The program aims to provide the Army with a survivable and mobile fleet of vehicles to replace the M113. The AMPV capitalizes on the Bradley Fighting Vehicle and M109A7 advanced Paladin self-propelled artillery designs to enable the AMPV to maneuver with other modern combat vehicles in the Army's armored brigade combat team (ABCT).

BAE Systems won a $400.9 million order in January 2020 to build 160 new AMPVs. That order was a modification to a potential $1.2 billion contract awarded to BAE Systems in late 2014 to develop and build the AMPV. BAE Systems engineers are designing the new vehicle to accommodate periodic technology upgrades.

Related: IS4S to use open-systems standards like SOSA for battlefield positioning, navigation, and timing (PNT)

The original 52-month contract called for BAE Systems to build 29 AMPVs across each of the variants. The award also provided an option to begin the low-rate initial production (LRIP) phase.

In 2017 BAE Systems won a $15.2 million order to upgrade the vetronics architecture of the AMPV with battlefield networking capability to enable the AMPV to be part of secure wireless networks to coordinate communications and tactics among other combat vehicles and command echelons, as well as provide networking among the vehicle's on-board systems.

On this order BAE Systems will do the work in York, Pa., and should be finished by February 2026. For more information contact BAE Systems Platforms & Services online at www.baesystems.com/en-us/our-company/inc-businesses/platforms-and-services, the Army Contracting Command-Detroit Arsenal at https://acc.army.mil/contractingcenters/acc-dta/, or the Army Tank-Automotive & Armaments Command at www.tacom.army.mil.

About the Author

John Keller | Editor-in-Chief

John Keller is the Editor-in-Chief, Military & Aerospace Electronics Magazine--provides extensive coverage and analysis of enabling electronics and optoelectronic technologies in military, space and commercial aviation applications. John has been a member of the Military & Aerospace Electronics staff since 1989 and chief editor since 1995.

Voice your opinion!

To join the conversation, and become an exclusive member of Military Aerospace, create an account today!